Sinotester Portable Cod Ammonia Nitrogen Analyzer in Water

Model NO.: XC-300
Method: Spectrophotometry
Measuring Range: 0-15000mg/L
Environment Relative Humidity: ≤80% No Condensation
Trademark: Sinotester
Transport Package: 1PC/Box
Specification: 125X90X70
Origin: China
HS Code: 9027500000
Model NO.: XC-300
Method: Spectrophotometry
Measuring Range: 0-15000mg/L
Environment Relative Humidity: ≤80% No Condensation
Trademark: Sinotester
Transport Package: 1PC/Box
Specification: 125X90X70
Origin: China
HS Code: 9027500000
Sinotester Portable Cod Ammonia Nitrogen Analyzer in Water

SINOTESTER Portable Cod Ammonia Nitrogen Analyzer in Water

This COD analyzer cod reactor analyzer manual will provide you with the necessary information for the correct use of the instrument. Please read it carefully before using the meter. 


Attention :
1.Any liquid or foreign substance entering the inspection chamber may damage the instrument.
2.If the concentration of water samples exceeds the range of the instrument, please dilute the water sample and measure again. The measured value multiplied by the dilution times is the concentration of water sample.
3.There should be no stains, scratches, dust or fingerprints on the surface of the test tube.
Battery requirements: Please use 1.5V AA alkaline batteries.

XC-200
Temperature Range 20-180oC
Accuracy ±3 oC(@ 25oC)
Capacity 4 vials (the diameter of vial should be not more than 16mm.)
Warm-up Time 10-15 minutes, depending on selected temperature
Heating period 0-120mins
Environment temperature (0-40)oC
Environment relative humidity <=85%
Power Supply DC 12V/10A
Dimensions 110*170*135 mm
Weight 1.4 KG with adaptor
XC-300
Temperature Range 20-180oC
Accuracy ±3 oC(@ 25oC)
Capacity 4 vials (the diameter of vial should be not more than 16mm.)
Warm-up Time 10-15 minutes, depending on selected temperature
Heating period 0-120mins
Environment temperature (0-40)oC
Environment relative humidity <=85%
Power Supply DC 12V/10A
Dimensions 110*170*135 mm
Weight 1.4 KG with adaptor
Operation processes
COD test
Steps Operation processes Description
1 Estimate the COD value of the water sample  
2 Choose the reagent and add the tested water sample according to the corresponding range.
  COD:
 o-150mg/L(c11)
COD :
100-1500mg/L(c12)
COD:
1000-15000mg/L(c13)
 
  1.take 2ml distilled water into a LR reagent tube(ZERO setting)
2.take 2ml water sample into another LR reagent tube.
1.take 2ml distilled water into a HR reagent tube(ZERO setting) 
2.take 2ml water sample into another HR reagent tube.
1.take 2ml distilled water into a HR reagent tube(ZERO setting) 
2. take 1.8ml distilled water into another HR reagent tube ,then add 0.2ml water sample.
★Note:C12 and C13 can use the same one zero setting tube.
 
★Danger:There have concentrated sulfuric acid in the test tube,please wear gloves to operate.
3 Tighten the reagent tube cap , shake well and put into the reactor, heat for 20 minutes at 165  ºC. ★Caution: Hot
 
4 After reaction, take out the reagent tube , when cooled to 80 ºC shake reagent tube again.  
5 Place the reagent tube on the tube rack and continue to cool to room temperature. This procedure prevents the reagent tube from shaking. ★Note:The suspended matter needs to be completely precipitated
6 Press "(ON/OFF)" button to turn on the meter, press "(SWITCH)" button to select the required test item.  
7 Open the detection cap,put it into the zero water sample reagent tube, cover the cap, press the "(ZERO)" button to zero setting. ★The tube wall should be cleaned.
8 Take out the zero water sample reagent tube, put in the water sample reagent tube and cover the cap. ★Under the c13 , when displayed as XXX   mg/L, the detection value is XXX00mg/L.
9 Press  "(READ)"button.The digits showed in the screen is the value of tested sample.
10 Press  "(ON/OFF)" button to turn off the meter

 
TOTAL PHOSPHORUS TEST  
Steps Operation processes Description
1 Estimate the total phosphorus value of the water sample  
2 Choose the reagent and add the tested water sample according to the corresponding range.
Total phosphorus: 0-2mg/L(L22) Total phosphorus:2-2mg/L(L23)  
1.take 5ml distilled water into an empty reagent tube(ZERO) 
2.take 5ml water sample into another empty reagent tube.
1.take 5ml distilled water into an empty reagent tube(ZERO)
2.take 0.5ml  water sample and 4.5ml distilled water into another empty reagent tube.
★L22 and L23 can use the same zero reagent tube.
 
3 Add 1 pack reagent 1 to each reagent tube, tighten the cap, shake it up and down for 5 seconds. ★The reagents doesn't need to be dissolved  totally
4 Put the reagent tube into the reactor, heat for 15 minutes at 150  ºC.  
5 After reaction, take out the reagent tube , when cooled to around 80 ºC shake reagent tube again. ★Cool 2-3 min
 
6 Press "(ON/OFF)" button to turn on the meter, press "(SWITCH)" button to select the required test item.  
7 Open the zero water sample reagent tube, add 1 package reagent 2, shake well, add 7 drops of activator P, shake 5 seconds, put it in the meter, press "(ZERO)" ,the meter will start 1 minute countdown,zero auto setting when countdown finished. Take out the zero water sample reagent tube. ★The tube wall should be cleaned
8 Open the water sample reagent tube, add 1 package reagent 2, shake well until it dissolved totally, add 7 drops activator P, shaking 5 seconds, put it in the meter, press "(READ)",and the meter will be automatically detected after 1 minute countdown.  

AMMONIA NITROGEN TEST 
 
Steps Operation processes Description
1 Press  "ON/OFF" button to turn on the meter ,  press "SWITCH" button to select the required test item. ★Take out the sleeve from the meter
★The marked place face the operator
2 Take 10ml distilled water and inject it into the mark line of cell,cover the cap,clean the surface of the cell,then put it into the detection chamber,cover the cap.
3 Press "ZERO". It done if shows the "0.00" on the screen. ★The tube wall should be cleaned
4 Pour out the pure water and take a small amount of tested water samples ,wash the cell. Pour out the wet liquid.  
5 Take 10ml (scale line) tested water sample to the cell.  
6 Add 6 drops of activator A1, shake well, add 6 drops of activator B2 and shake well. Put the cell in the detection chamber, press "()READ" , and the meter will be automatically detected after 3 minutes countdown. ★environmenttemperature:15ºC-25ºC
7 Press" ON/OFF" to turn off the meter.Then clean the cell.  

Attention:

1.The activator is irritating,wash immediately with plenty of water if touched with the skin.
2.This meter can not test the COD/Total phosphorus/Ammonia nitrogen at same time.
 
Note:
      1.15ºC-25ºC is the best temperature for ammonia nitrogen test. It won't influence test result if  
      Little reagents undissolved.
       2.Any solution or foreign matter inside the detection chamber,may damage the meter.
       3.If the concentration of water sample higher than the test range,please choose high test range for testing,or tested after diluted by distilled water,the test result should multiply by the dilution ratio.  
       4.The surface of test tube should avoid waterlogging,scratch,dust, fingerprint and so on.
       5.Take action to the sequence and numbers of  activator adding. 
       6.The reagent bag is easy to tear.
       7.The sucker of pipette can not be used crossly.
       8.It is normal if there have precipitate in the COD reagent tube.
       9.The meter should be placed on the table,it can not be tilt or shake violently when testing in other place.   

Sinotester Portable Cod Ammonia Nitrogen Analyzer in Water
Sinotester Portable Cod Ammonia Nitrogen Analyzer in Water
Sinotester Portable Cod Ammonia Nitrogen Analyzer in Water Sinotester Portable Cod Ammonia Nitrogen Analyzer in Water

SINOTESTER Portable Cod Ammonia Nitrogen Analyzer in Water

This COD analyzer cod reactor analyzer manual will provide you with the necessary information for the correct use of the instrument. Please read it carefully before using the meter. 


Attention :
1.Any liquid or foreign substance entering the inspection chamber may damage the instrument.
2.If the concentration of water samples exceeds the range of the instrument, please dilute the water sample and measure again. The measured value multiplied by the dilution times is the concentration of water sample.
3.There should be no stains, scratches, dust or fingerprints on the surface of the test tube.
Battery requirements: Please use 1.5V AA alkaline batteries.

XC-200
Temperature Range 20-180oC
Accuracy ±3 oC(@ 25oC)
Capacity 4 vials (the diameter of vial should be not more than 16mm.)
Warm-up Time 10-15 minutes, depending on selected temperature
Heating period 0-120mins
Environment temperature (0-40)oC
Environment relative humidity <=85%
Power Supply DC 12V/10A
Dimensions 110*170*135 mm
Weight 1.4 KG with adaptor
XC-300
Temperature Range 20-180oC
Accuracy ±3 oC(@ 25oC)
Capacity 4 vials (the diameter of vial should be not more than 16mm.)
Warm-up Time 10-15 minutes, depending on selected temperature
Heating period 0-120mins
Environment temperature (0-40)oC
Environment relative humidity <=85%
Power Supply DC 12V/10A
Dimensions 110*170*135 mm
Weight 1.4 KG with adaptor
Operation processes
COD test
Steps Operation processes Description
1 Estimate the COD value of the water sample  
2 Choose the reagent and add the tested water sample according to the corresponding range.
  COD:
 o-150mg/L(c11)
COD :
100-1500mg/L(c12)
COD:
1000-15000mg/L(c13)
 
  1.take 2ml distilled water into a LR reagent tube(ZERO setting)
2.take 2ml water sample into another LR reagent tube.
1.take 2ml distilled water into a HR reagent tube(ZERO setting) 
2.take 2ml water sample into another HR reagent tube.
1.take 2ml distilled water into a HR reagent tube(ZERO setting) 
2. take 1.8ml distilled water into another HR reagent tube ,then add 0.2ml water sample.
★Note:C12 and C13 can use the same one zero setting tube.
 
★Danger:There have concentrated sulfuric acid in the test tube,please wear gloves to operate.
3 Tighten the reagent tube cap , shake well and put into the reactor, heat for 20 minutes at 165  ºC. ★Caution: Hot
 
4 After reaction, take out the reagent tube , when cooled to 80 ºC shake reagent tube again.  
5 Place the reagent tube on the tube rack and continue to cool to room temperature. This procedure prevents the reagent tube from shaking. ★Note:The suspended matter needs to be completely precipitated
6 Press "(ON/OFF)" button to turn on the meter, press "(SWITCH)" button to select the required test item.  
7 Open the detection cap,put it into the zero water sample reagent tube, cover the cap, press the "(ZERO)" button to zero setting. ★The tube wall should be cleaned.
8 Take out the zero water sample reagent tube, put in the water sample reagent tube and cover the cap. ★Under the c13 , when displayed as XXX   mg/L, the detection value is XXX00mg/L.
9 Press  "(READ)"button.The digits showed in the screen is the value of tested sample.
10 Press  "(ON/OFF)" button to turn off the meter

 
TOTAL PHOSPHORUS TEST  
Steps Operation processes Description
1 Estimate the total phosphorus value of the water sample  
2 Choose the reagent and add the tested water sample according to the corresponding range.
Total phosphorus: 0-2mg/L(L22) Total phosphorus:2-2mg/L(L23)  
1.take 5ml distilled water into an empty reagent tube(ZERO) 
2.take 5ml water sample into another empty reagent tube.
1.take 5ml distilled water into an empty reagent tube(ZERO)
2.take 0.5ml  water sample and 4.5ml distilled water into another empty reagent tube.
★L22 and L23 can use the same zero reagent tube.
 
3 Add 1 pack reagent 1 to each reagent tube, tighten the cap, shake it up and down for 5 seconds. ★The reagents doesn't need to be dissolved  totally
4 Put the reagent tube into the reactor, heat for 15 minutes at 150  ºC.  
5 After reaction, take out the reagent tube , when cooled to around 80 ºC shake reagent tube again. ★Cool 2-3 min
 
6 Press "(ON/OFF)" button to turn on the meter, press "(SWITCH)" button to select the required test item.  
7 Open the zero water sample reagent tube, add 1 package reagent 2, shake well, add 7 drops of activator P, shake 5 seconds, put it in the meter, press "(ZERO)" ,the meter will start 1 minute countdown,zero auto setting when countdown finished. Take out the zero water sample reagent tube. ★The tube wall should be cleaned
8 Open the water sample reagent tube, add 1 package reagent 2, shake well until it dissolved totally, add 7 drops activator P, shaking 5 seconds, put it in the meter, press "(READ)",and the meter will be automatically detected after 1 minute countdown.  

AMMONIA NITROGEN TEST 
 
Steps Operation processes Description
1 Press  "ON/OFF" button to turn on the meter ,  press "SWITCH" button to select the required test item. ★Take out the sleeve from the meter
★The marked place face the operator
2 Take 10ml distilled water and inject it into the mark line of cell,cover the cap,clean the surface of the cell,then put it into the detection chamber,cover the cap.
3 Press "ZERO". It done if shows the "0.00" on the screen. ★The tube wall should be cleaned
4 Pour out the pure water and take a small amount of tested water samples ,wash the cell. Pour out the wet liquid.  
5 Take 10ml (scale line) tested water sample to the cell.  
6 Add 6 drops of activator A1, shake well, add 6 drops of activator B2 and shake well. Put the cell in the detection chamber, press "()READ" , and the meter will be automatically detected after 3 minutes countdown. ★environmenttemperature:15ºC-25ºC
7 Press" ON/OFF" to turn off the meter.Then clean the cell.  

Attention:

1.The activator is irritating,wash immediately with plenty of water if touched with the skin.
2.This meter can not test the COD/Total phosphorus/Ammonia nitrogen at same time.
 
Note:
      1.15ºC-25ºC is the best temperature for ammonia nitrogen test. It won't influence test result if  
      Little reagents undissolved.
       2.Any solution or foreign matter inside the detection chamber,may damage the meter.
       3.If the concentration of water sample higher than the test range,please choose high test range for testing,or tested after diluted by distilled water,the test result should multiply by the dilution ratio.  
       4.The surface of test tube should avoid waterlogging,scratch,dust, fingerprint and so on.
       5.Take action to the sequence and numbers of  activator adding. 
       6.The reagent bag is easy to tear.
       7.The sucker of pipette can not be used crossly.
       8.It is normal if there have precipitate in the COD reagent tube.
       9.The meter should be placed on the table,it can not be tilt or shake violently when testing in other place.   

Sinotester Portable Cod Ammonia Nitrogen Analyzer in Water
Sinotester Portable Cod Ammonia Nitrogen Analyzer in Water
Sinotester Portable Cod Ammonia Nitrogen Analyzer in Water

Organic chicken manure production line

 

The fresh chicken manure which discharged from broiler farm, layer farm is very large amount, how to right treat these large amount of manure is an urgent task for all poultry farmers. According to clients request, we expansion the poultry project into chicken manure organic fertilizer, which not only solve the problem for clients, but also greatly generate the profit from whole poultry project.

 

The chicken manure fertilizer production line is use fresh chicken manure as raw material, and after serial of processing, and get products of natural organic fertilizer. There are two stage for processing the chicken manure into commercial organic fertilizer, which first is pre-fermentation, and second is with serial processing like grinding the material, filter, mixing, pelleting, drying, cooling, filter, coating, packing -.

 

The features of chicken organic fertilizer

 

1.       There is no any chemical parts, due to chicken digest ability is low who just digest 25% of nutrients in chicken feed, and other 75% of nutrients are goes away with manure, which manure organic fertilizer contains rich nitrogen, phosphorus, potassium, organic meter, amino acid, protein and so on.

2.       The organic matter in fertilizer enhance the organic matter contain in soil. Organic matter improve physical, chemical, and biological properties of soil.

3.       The organic manure in chicken manure not only adds a lot of organic colloids, but also decomposes and convert many organic compounds into organic colloids with the help of microorganism, which greatly increases soil adsorption and produces a lot of sticky material, which makes the soil particles cemented into stable pellet structure, and improves the soil water conservation and fertilizer conservation. Breathability and ability to regulate soil temperature.

4.       The organic manure of chicken manure also make a large number of microorganisms in the soil, especially many beneficial microbes, such as nitrogen fixing bacteria, ammoniated bacteria, cellulose decomposing bacteria, nitrifying bacteria and so on. The organic chicken manure contains all kinds of active enzymes secreted by the digestive tract of animals, and various enzymes produced by microbes. After these substances are applied to the soil, the enzyme activity of the soil can be greatly improved.

5.       Organic chicken manure improve soil activity and biotransformation ability, thereby enhancing soil absorbability, buffer performance and stress resistance.

 

There three models of chicken manure production line:

High Standard:  manure dehydrator, fermenting dumping machine, grinder, mixer, pelleting, drying, cooling, filter, coating, packing, and belt conveyors-etc.

Middle standard: raw material grinder, mixer, pelleting, drying, cooling, filter, packing, and belt conveyors-etc.

Low standard: raw material grinder, mixing, pelleting or filter, packing. 


manure prcessing line



534_1


534_2


534_3

Manure Fertilizer Processing Equipment

Manure Fertilizer Processing Equipment,Chicken Manure Fertilizer Processing Line,Organic Manure Fertilizer Equipment,Organic Chicken Manure Fertilizer Machine

Connect Group For Poultry Project , https://www.connectpoultry.com