Suspension Parts Center Link MB080104 for Mitsubishi

Model NO.: CR-FIII-C
Position: Front Axle
Color: Black, White, Golden
Ball Pin: 40cr
Length: 766mm
Carton Size: 85.5*25.5*17.5cm
Service: OEM/ODM
Trademark: Good Link
Specification: ISO9001, TS16949
Origin: Changzhou, Jiangsu
HS Code: 8708949090
Model NO.: CR-FIII-C
Position: Front Axle
Color: Black, White, Golden
Ball Pin: 40cr
Length: 766mm
Carton Size: 85.5*25.5*17.5cm
Service: OEM/ODM
Trademark: Good Link
Specification: ISO9001, TS16949
Origin: Changzhou, Jiangsu
HS Code: 8708949090
Mitsubishi Suspension Parts Center Link MB080104

1.Product Application: Japanese Car---Mitsubishi
 
2.Our Advantages:
1)More than 10 years production experience;
2)Over 7,000 kinds of product can be provided;
3)Products are popular used in Japanese, Korean, European and American Vehicles;
4)Good raw material and advanced technology;
5)12 month years warranty;
6)Quality meet the standard of ISO/TS16949:2009;
7)Modern production management system to gurantee on time delivery.

3.Product Range:
Control Arm
Ball Joint
Stabilizer Link
Inner Arm Shaft Kit
Rack End
Tie Rod End
Cross Rod
Pitman Arm
Idler Arm
Side Rod Assy

4.Product Packing:
1)Neutral Packing: neutral plastic bag+neutral tan box+neutral carton
2)Color Box Packing: JLD plastic bag+ JLD color box+ neutral carton
3)Customized Packing

5.RFQ:
Q:How many years you have been in the field of suspension and steering parts?
A:Our company was established in 2004.

Q:What is your business type, manufacturing or trading?
A:We are manufacturer, and our factory address is No. 36 Lvshu East Road, Xuejie Town, Xinbei District, Changzhou, Jiangsu, China.

Q:How many kinds of product you can provide, and what are they used for?
A:We have more than 7,000 kinds of suspension and steering parts, and they are popular used in Japanese, Korean, European and American Cars.

Q:Do you make any test about your product. And what are they?
A:Yes, and what test we do including high/low temperature test, ozon experiment, salt-fog test, torque test,pulling-out force test etc. 

Q:Do you provide any gurantee about our product?
A:1 years warranty provided under normal condition.

Q:What is your MOQ and lead time?
A:MOQ: it depends on what item you are looking for, often it is around 100 to 300 pieces for each type.
   Lead Time: for one 20'GP, it need about 50 to 60 days. Mitsubishi Suspension Parts Center Link MB080104

1.Product Application: Japanese Car---Mitsubishi
 
2.Our Advantages:
1)More than 10 years production experience;
2)Over 7,000 kinds of product can be provided;
3)Products are popular used in Japanese, Korean, European and American Vehicles;
4)Good raw material and advanced technology;
5)12 month years warranty;
6)Quality meet the standard of ISO/TS16949:2009;
7)Modern production management system to gurantee on time delivery.

3.Product Range:
Control Arm
Ball Joint
Stabilizer Link
Inner Arm Shaft Kit
Rack End
Tie Rod End
Cross Rod
Pitman Arm
Idler Arm
Side Rod Assy

4.Product Packing:
1)Neutral Packing: neutral plastic bag+neutral tan box+neutral carton
2)Color Box Packing: JLD plastic bag+ JLD color box+ neutral carton
3)Customized Packing

5.RFQ:
Q:How many years you have been in the field of suspension and steering parts?
A:Our company was established in 2004.

Q:What is your business type, manufacturing or trading?
A:We are manufacturer, and our factory address is No. 36 Lvshu East Road, Xuejie Town, Xinbei District, Changzhou, Jiangsu, China.

Q:How many kinds of product you can provide, and what are they used for?
A:We have more than 7,000 kinds of suspension and steering parts, and they are popular used in Japanese, Korean, European and American Cars.

Q:Do you make any test about your product. And what are they?
A:Yes, and what test we do including high/low temperature test, ozon experiment, salt-fog test, torque test,pulling-out force test etc. 

Q:Do you provide any gurantee about our product?
A:1 years warranty provided under normal condition.

Q:What is your MOQ and lead time?
A:MOQ: it depends on what item you are looking for, often it is around 100 to 300 pieces for each type.
   Lead Time: for one 20'GP, it need about 50 to 60 days.

Commercial Popcorn Machine

Commercial Popcorn Machine,Flavored Popcorn Machine,Simple Operate Popcorn Machine,Caramerl Popcorn Machine

Jinan RuiHan Trading Company Limited , https://www.ruihangroup.com