Flange is also called flange plate or flange plate. Cold Galvanizing Flange,Bspt Flange,Screwed Flange,Bspt Flange Jinan Xintai Forging Co., Ltd , https://www.xtdzflange.com
Parameter
Mold Type
Plastic injection mold, Overmolding, Blowing mould, Extrusion mould, Absorbing-plastics mould,Die-casting mould, Rubber/silicone mould
Design software
UG, ProE, Auto CAD, Solidworks, etc.
Main services
Prototypes, Mold design, Mold making, Mold tesing, low volume/ high volume plastic production
Certificate
ISO 9001:2008
Steel material
718H,P20,NAK80,S316H,SKD61, etc.
Plastic production Raw material
PP,PA6,PLA,AS,ABS,PE,PC,POM,PVC, PET,PS,TPE/TPR etc
Mold base
HASCO ,DME ,LKM,JLS standard
Mold runner
Cold runner, hot runner
Mold hot runner
DME, HASCO, YUDO,etc
Mold cold runner
point way, side way, follow way, direct gate way,etc.
Mold strandard parts
DME, HASCO, etc.
mold life
>300,000 shots
Mold hot treatment
quencher, nitridation, tempering,etc.
Mold cooling system
water cooling or Beryllium bronze cooling, etc.
Mold surface
EDM, texture, high gloss polishing
Hardness of the steel
20~60 HRC
Equipments
High speed CNC, standard CNC, EDM, Wire cutting, Grinder,Lathe, Milling machine, plastic injection machine
Lead time
25~60 days
Month Production
30 sets/month
Photos
Customer
transportation
Factoy workshop
FAQ:
Q1. How can I get a quotation of plastic injection molding?
A: As soon as we received your sample, design or detail request, we will offer you a quotation with detail information. As usually it needs 1~3 days. If you are urgent, please inform us particularly.
Â
Q2. How do you control your products quality ?
A: 1. We have inspection system for every step, including the material.
  2. We will offer final products sample to you for checking.
Â
Q3. Are you a manufacture ?
A: Yes, we have a factory, welcome to visit us.
Â
Q4. Do you reject small order ?
A: No, we won't do that, we believe that every big business starts from small business, it is our honor to have your trust and produce for you.
Q5. How long is the lead-time for mold?
A: It depends on the mold's size and complexity. Normally, the lead time is 25~35days. If the molds are very simple and not big size, we can work out within 15 days.
Â
Q6. IÂ have no 3D drawing, how should IÂ start the new project?
A: You can supply us a sample, we will help you finish the 3D drawing design.
Â
Q7. Before shipment, how to make sure the products are qualified?
A: You can come to site inspection, or ask a third party to do that. And we will take videos and pictures of production process detail include process report, products size ,structure and surface detail, packing detail to you, whatever you request.
Â
Q8. Can you produce the plastic goods for me.
A: Yes, we can. We can produce the plastic goods for you after the moulds are done, we have injection machines
Q9. What is the payment term.
A: As usually, 40% deposit in advance after the order is confirmed, another 40% payment after the samples are approved, the balance of 20% payment before shipping. But that is also can be discussed.
  But if for plastic goods order, 30% deposit in advance, the balance of 70% payment before goods shipping.
If you have demand, please contact me with email
Or add my Skype
Let's talk about more details!
Â
The part that connects pipes to each other. Connect to tube end. There are holes on the flange, and bolts can be threaded to make the two flanges tightly connected. The flange is sealed with gasket.
Plastic Trash Basket Mould
Model NO.: TBD
Runner: Cold Runner
Design Software: Ug/PRO-E/Autocad
Installation: Fixed
Certification: ISO
Customized: Customized
Trademark: OEM
Transport Package: Wood Shelf
Specification: TBD
Origin: China
HS Code: 8480790090
Plastic injection cool runner mould for daily chair