Plastic Trash Basket Mould

Model NO.: TBD
Runner: Cold Runner
Design Software: Ug/PRO-E/Autocad
Installation: Fixed
Certification: ISO
Customized: Customized
Trademark: OEM
Transport Package: Wood Shelf
Specification: TBD
Origin: China
HS Code: 8480790090
Plastic injection cool runner mould for daily chair


Parameter
Mold Type Plastic injection mold, Overmolding, Blowing mould, Extrusion mould, Absorbing-plastics mould,Die-casting mould, Rubber/silicone mould
Design software UG, ProE, Auto CAD, Solidworks, etc.
Main services Prototypes, Mold design, Mold making, Mold tesing, low volume/ high volume plastic production
Certificate ISO 9001:2008
Steel material 718H,P20,NAK80,S316H,SKD61, etc.
Plastic production Raw material PP,PA6,PLA,AS,ABS,PE,PC,POM,PVC, PET,PS,TPE/TPR etc
Mold base HASCO ,DME ,LKM,JLS standard
Mold runner Cold runner, hot runner
Mold hot runner DME, HASCO, YUDO,etc
Mold cold runner point way, side way, follow way, direct gate way,etc.
Mold strandard parts DME, HASCO, etc.
mold life >300,000 shots
Mold hot treatment quencher, nitridation, tempering,etc.
Mold cooling system water cooling or Beryllium bronze cooling, etc.
Mold surface EDM, texture, high gloss polishing
Hardness of the steel 20~60 HRC
Equipments High speed CNC, standard CNC, EDM, Wire cutting, Grinder,Lathe, Milling machine, plastic injection machine
Lead time 25~60 days
Month Production 30 sets/month

Photos

Plastic Trash Basket Mould



Customer
Plastic Trash Basket Mould

transportation

Plastic Trash Basket Mould
Factoy workshop
Plastic Trash Basket Mould
Plastic Trash Basket Mould

FAQ:


Q1. How can I get a quotation of plastic injection molding?
A: As soon as we received your sample, design or detail request, we will offer you a quotation with detail information. As usually it needs 1~3 days. If you are urgent, please inform us particularly.
 
Q2. How do you control your products quality ?
A: 1. We have inspection system for every step, including the material.
  2. We will offer final products sample to you for checking.
 
Q3. Are you a manufacture ?
A: Yes, we have a factory, welcome to visit us.
 
Q4. Do you reject small order ?
A: No, we won't do that, we believe that every big business starts from small business, it is our honor to have your trust and produce for you.

Q5. How long is the lead-time for mold?
A: It depends on the mold's size and complexity. Normally, the lead time is 25~35days. If the molds are very simple and not big size, we can work out within 15 days.
 
Q6. I have no 3D drawing, how should I start the new project?
A: You can supply us a sample, we will help you finish the 3D drawing design.
 
Q7. Before shipment, how to make sure the products are qualified?
A: You can come to site inspection, or ask a third party to do that. And we will take videos and pictures of production process detail include process report, products size ,structure and surface detail, packing detail to you, whatever you request.
 
Q8. Can you produce the plastic goods for me.
A: Yes, we can. We can produce the plastic goods for you after the moulds are done, we have injection machines

Q9. What is the payment term.
A: As usually, 40% deposit in advance after the order is confirmed, another 40% payment after the samples are approved, the balance of 20% payment before shipping. But that is also can be discussed.
  But if for plastic goods order, 30% deposit in advance, the balance of 70% payment before goods shipping.

If you have demand, please contact me with email

Or add my Skype

Let's talk about more details!

 

Flange is also called flange plate or flange plate.
The part that connects pipes to each other. Connect to tube end. There are holes on the flange, and bolts can be threaded to make the two flanges tightly connected. The flange is sealed with gasket.

Forged Flange

Cold Galvanizing Flange,Bspt Flange,Screwed Flange,Bspt Flange

Jinan Xintai Forging Co., Ltd , https://www.xtdzflange.com