The partial failure and repair process is as follows: Active Pharmaceutical Ingredient
Active pharmaceutical ingredients (APIs) are part of any drug that produces the desired effect. Some drugs, such as combination therapy, have a variety of active ingredients that can treat different symptoms or work in different ways.
All drugs consist of two core components: the API (which is the main component) and the excipient (a substance other than the drug that helps deliver the drug to the system). An excipient is a chemically inert substance, such as lactose or mineral oil in a pill.
Manufacturers use certain criteria to determine the strength of the API in each drug. However, standards vary widely from brand to brand. Each brand may use a different test method, which may result in different effects.
In all cases, the FDA requires manufacturers to demonstrate the effectiveness of their products in real life and under laboratory conditions.
The quality of the API has a significant impact on the efficacy of the drug (producing the desired results) and the safety of the drug. Poor-quality APIs or mismanufactured products have been linked to serious problems, such as illness or death.
Even in the case of outsourcing, APIs are subject to strict regulations and supervision from their shipping countries. For example, API plants overseas are still subject to inspection by the U.S. Food and Drug Administration.
Meloxicam,meloxicam 15 mg,ibuprofen,ibuprofen dosage,Acetylsalicylic acid,Acetylsalicylic acid molar mass Jinan Forever Chemical Co., Ltd. , https://www.jinanforever.com
When the insulation between the upper iron yoke plates is aged, and the other cores are normal, as long as the upper iron yoke laminations are removed to remove the paint film and paint, the other parts do not need to move.
Old-fashioned transformers broke due to the core-insulated bolts and the partial iron shorts caused partial short-circuits in the iron core. When repairing, the upper yoke should be removed, the faulty phase windings should be hoisted, and the cored bolt with broken insulation pipe should be removed.
If there are not many short circuits and the depth is not deep, use a special spatula to remove the sticky burrs, and then apply No. 1032 paint. Take this opportunity to dismantle all the core bolts on the core column, and then replace the core bolts with a latitude banding for fastening. However, it should be noted that the no-strike straps should not be too thick to prevent them from affecting the windings. Generally, the distribution transformer has no tie straps with a thickness of 1 to 2 mm. If necessary, several tie straps may be added to reduce the thickness of the tie straps. If the short-circuited laminations are severely burned and the depth is deeper and they are already bonded together, remove the core laminations, remove the short-circuits with a flat spade and remove the burrs. After the flattening, remove the residual film and repaint it. And dry it.
Ground fault causes a short circuit in the chip. During processing, remove the sticky laminations on the surface of the iron core with a thin flat spade to remove burrs and paint.
Iron yoke clips or other metal parts are loose, causing vibration, resulting in iron core overheat discoloration, film burnt and so on. After inspection, the faulty piece is removed and repaired when the fault is serious, and the intact part does not move. When assembling damaged laminates, the repaired and intact laminates are interleaved and mixed. After repairs, do iron loss and temperature rise tests.