Automatic Insulating Glass Gas Filling Production Line
Automatic Gas Filling Production Line for Insulating Glass achieve European standard,automatically fill gas capacity more than 90%.Not only fill gas for normal double glazing,but also for the shape glazing and step glazing.It is a better mass production equipment to produce insulating glass with high automatic degree, high efficiency, easiness of operation and maintenance.
Double Glazing Glass Production Line,Automatic Insulating Glass Production Line,Ce Certification Insulating Glass Production Line,Washing Drying Pressing Assembling Line JINAN WEILI MACHINE CO LTD , https://www.wgmglassmachine.com
1. Offer mould core, cavity steel certificate
2. Offer mould trial video, good after-service
1. Long life
2. Short delivery time
3. With best machining
4. Good after-service
JSL Mould Quality Control
For the Q/C of mould, there are 3 steps:
1. Mould Material Q/C
- Mould Steel Checking(Hardness, flaw detection)
- Mould Standard Spare Parts Checking(hardness, size, flaw checking)
2. Mould Making Process Q/C
- design checking (part design, mould design, mould engineering drawing)
- checking each part of mould's size after machining, according to 2D drawing
- mould testing(check mould running condition)
3. Check with customer's requirement again before mould shipping.
Product Name
Injection Plastic Dust Waste Garbage Rubbish Bin Mould
Product material
PP/HDPE
Core& Cavity Steel
718
Steel hardness:Â
HRC34-38
Mould Standard
DME
Cavity Number
1*1
Injection System
Direct gate
Ejector System
 Ejector Plate
Cycle Time
45 second/shot
Tooling lead time
60 days
Mould life
500, 000 times
Quality assurance
ISO9001
Our Advantage
1. High quality
2. Reasonable price 3. On time delivery 4. Good After-sale service 5. Strict quality control 6. All the mould are automotic.
Offer you
In-time response on letters, telephone calls or fax
In-time supply the quotation and mould designs In-time communication on the technical points In-time sending pictures for the mould machining progress and mould finishing schedule In-time mould test and sample delivery In-time mould delivery  For more information please contact us.
Injection Plastic Dust Waste Gabbage Rubbish Bin Mould
Model NO.: JSL-N0807-5
Runner: Hot Runner
Design Software: Autocad, Ug, PRO-E, Solidwork
Installation: Mobile
Certification: ISO
Standard: DME
Customized: Customized
Mould Base: S50c
Mould Operating Mode: Automatically
T1 Sample Time: 60days
Runner System: Hot Runner/Cold Runner
Mould Standard: Dme, Lkm, Hasco
Offer You: OEM&ODM Service
Mould Design Software: Ug, Proe, Solidworks, CAD, etc
Heat Treatment: Nitriding, etc
Quality Control: in House Professiona QC
Brand Name: Jslmould
Trademark: JSLMOULD
Transport Package: Wooden Crate
Specification: Dme
Origin: Taizhou, China
HS Code: 8480719090
Injection Plastic Dust Waste Gabbage Rubbish Bin Mould