-
Model NO.: ZYYX
-
Certification: CE, ISO
-
Customized: Customized
-
Transmission Method: Electric
-
Delivery Time: About 60 Days
-
Step Distance: Made to Order
-
Hydraulic Motor: 2.2kw
-
Quality System: ISO9001
-
Cutter Material: Cr12 Mould Steel Being Quenched Treatment
-
Transport Package: 1*40gp Container for One Machine
-
Origin: China
-
Tile Type: Glazed Steel
-
Condition: New
-
Usage: Roof, Wall
-
Machine Size: 11000*1600*1600mm
-
Operation Language: English or as Per Client`S Required
-
Main Motor: 7.5kw
-
Guarantee Time: First Year Free, Lifetime Services
-
Rollers Material: No.45 Forged Steel, Plated with Hard Chrom
-
Trademark: zhongyuan
-
Specification: CE SGS BV
-
HS Code: 84552210
Water Ripple Roof Panel Roll Forming Machine ManufacturersWhy USÂ Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â
Â
Parameters of  Water Ripple Roof Panel Roll Forming Machine Manufacturers
Item |
Specification |
Material |
Type |
Pre-painted steel coil & galvanized coils |
Thickness (mm) |
0.4-0.6 |
Yield strength (mpa) |
235-345 |
Roller material |
45#Chrome steel |
Forming speed(m/min) |
About 15 |
Out put speed |
0-4m/min |
Speed adjusting mode |
ACÂ Frequency |
Roller drive                                               |
Decelerating motor + Chain drive |
Cutting mode |
Hydraulic cutting |
Cutter material |
Cr12 mold steel |
Length measurement |
Encoder |
Control mode |
Mitsubishi PLC |
Operating mode |
Button + Mitsubishi Touch screen |
Main motor power (kw) |
7.5 kw (Depend on final design) |
Hydraulic station power |
2.2 kw (Depend on final design) |
Total power (kw) |
9.7Â kw |
Uncoiler's loading capacity |
Max. Capacity: 5000kgs (can be increased to be 10T) |
Wholw line install size |
About 18*1.7*1.6m (Depend on final design) |
Components of Water Ripple Roof Panel Roll Forming Machine Manufacturers
Decoiler |
1set   |
Feeding & guiding device |
1set |
Main roll forming machine |
1set |
Pressing device |
1set |
Hydraulic cutting system |
1set |
Controlling system |
1set |
Run out table |
1set   |
Process flow:
Decoiler -- Feeding & Guiding -- Roll Forming-- Pressing--Hydraulic Cutting - Product to Run Out TableCertifications                                       Â
FAQÂ Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Q1:When your factory extablished?Â
A1:Â We extablished since 2003, team with engineers who have 20 years experience in metal forming machine industry. We produce machine all-in-house, from raw material to ready machine, all done in our factory, so that we can control our machine quality and delivery time.Â
Q2:How long does it take to deliver the machine after the order & deposit?
A2:Usually it will take 50-60 working days to manufacture the machine and make it ready to deliver. At first 15 days the technical drawing will be made. The second 25 days start manufacturing the parts and ready to assemble. In the last 20 days the machine will be assembled and inspected to make sure it is ready to deliver.
Q3:What is your warranty term?
A3:Machine warranty time is 12 months. We supply life time service for our produced machines for all customers.Â
Q4:Can you offer oversea service?
A4:Yes,we have experienced technicians who can be sent to different countries to install our machines and supply others service .Factory                                            Â
Â
Graphite Box
Graphite Box,Graphite Gear Box,Molded Graphite Box,Parts For Graphite Gearbox
Henan Carbon Road New Material Technology Co., Ltd , https://www.kygraphiteparts.com