Zowell 2 tons Electric Towing Tractor is a warehouse
machine used for various materials transportation. It can move heavy and numerous
materials efficiently with load carriers behind, and widely used in logistics,
airport, textile industry, etc.
Zowell electric tractor is featured with compact
size, strong power, convenient maintenance, safety and stability. AC motor,
active stability and OPS system enable Zowell XT tractors to move materials
quickly, smoothly and safely. Our battery side pull design, quick release tow hitch
and regenerative braking function significantly improve the working efficiency
and operating experience.
The standard capacity Zowell towing tractor
ranges from 2 ton to 6 ton with many additional options such as half/full
closed cabin, PU wheel, rear solid tire, electric power steering, front bumper
to meet any needs. If you need bigger capacity or other customized option,
please contact us so that we can provide you best solution with professional knowledge.
Suzhou
Pioneer Material Handling Equipment & Technology Co., LTD was established
in 2005. The factory is located in Suzhou Wuzhong district, Xujiang industrial
park.Zowell is the English trademark and its Chinese trademark is pronounced
zhuoyi. The company is a national high-tech enterprise which has been awarded
the the title of national intellectual property superiority enterprise and it
has its own Suzhou engineering technology research and development center.
electric tow trucks,full electric towing tractor,electric tow tractor truck,Crown electric tow tractor Suzhou Pioneer Material Handling Equipment & Technology Co., Ltd , https://www.xianfengforklift.com
On June 17, Zhonghai Industrial Changxing Shipyard successfully completed the repair work of the “Cadoña†round.
The "Cadonia" round officially entered the Changxing Shipyard for maintenance on June 7. The main works of this repair are: the tip chamber, the steel between the steering gears, the ballast tank around the 3rd, the outer tank of the left oil tank on the 4th, the steel frame such as the longitudinal frame, and the steel system for the hatch cover.
Because the repairing project is tight due to the docking period and the requirements are high, the construction workers in the hull workshop also put forward higher requirements. The ship was scheduled to have a steel project on June 10, requiring completion on the 14th. After five days of overnight operations, it finally met the requirements of the shipowner. For the sporadic projects proposed on the ship, the workshop and construction personnel also actively cooperated to ensure the quality and quantity meet the requirements of the shipowners.
The shipowner is very satisfied with the progress and quality of the repair work of the "Cadonia" round and the importance that Changxing Shipyard attaches to the shipowners, especially the construction workers in the hull workshop.