Plastic Outdoor Garbage Bin Mould

Model NO.: JSL-T1782-1
Runner: Hot Runner
Design Software: Ug,PRO-E,Solidwork
Installation: Fixed
Certification: ISO
Standard: Dme/Lkm/Hasco
Customized: Customized
Mould Base: S50c/C45
Mould Quality Control: Professional QC in House Machine
Machine Equipment: CNC,EDM,Wire Cutting Machine,Drilling/Grinding
Mould Cooling System: by Experienced Designer
Mould Operating Mode: Automatically by CNC
Heat Treatment: Nitriding, etc
Design: 7days
Mould Report: 7-10days Per Time
T1 Sample: 50days
Aftersale: Yes
Trademark: JSLMOULD
Transport Package: Wooden Crate
Specification: AS REQUIREMENT
Origin: China
HS Code: 8480719090
Product Name Plastic Outdoor Garbage bin mould 
Product material pp
Core& Cavity Steel 718
Steel hardness:   HRC34-38
Mould Standard DME
Cavity Number ONE
Injection System Direct gate 
Ejector System air push
Cycle Time 60SECOND/SHOT
Tooling lead time 60 days
Mould life 500, 000 times
Quality assurance ISO9001
 
Our Advantage 1. High quality
2. Reasonable price
3. On time delivery
4. Good After-sale service
5. Strict quality control
6. All the mould are automotic.
 
Offer you In-time response on letters, telephone calls or fax
In-time supply the quotation and mould designs
In-time communication on the technical points
In-time sending pictures for the mould machining progress and mould finishing schedule
In-time mould test and sample de
 
 
Processing Time
Prepare Steel 5 days
CNC Machining 10 days
Drill 8 days
Heat treatment 6 days
High speed CNC Machining 7 days
Assembling and Fitting 6 days
Polishing 6 days
T1 mould test 2 days
 
1. Samples/Drawing & Requirement from you
2. Mould design: we will Communicate& Exchange the opinion with you after you place order.
3. Material Purchase: Steel cutting and Mould base tooling. 
4. Assembling.
5. Inspection of mould: following and controlling the tooling processing.
6. Mould testing: We will inform you the date. Than will send the sample' s inspection report& injection parameters with the sample to you!
7. Your instruction & confirmation for shipment.
8. Ready made mould before packing.

Precision Automobile Part

Precision Automobile Part,Automobile Parts Casting,Automobile Parts Electroplating,Precision Zinc Alloy Die Casting

Dongguan Shangjie Precision Hardware Co., Ltd , https://www.sphzincalloy.com