On September 22, Runbang announced that the company's wholly-owned subsidiary, Nantong Runbang Heavy Machinery Co., Ltd. and Xiamen Shipbuilding Heavy Industry Co., Ltd. have signed a total solution for the lifting and lifting system of its offshore wind power installation platform. "1+1" sales contract. That is, "1000T around pile crane (main crane) sales contract", "200T auxiliary crane sales contract", "hydraulic bolt type lifting system sales contract" and corresponding alternative contracts. The total contract price was RMB 169 million, accounting for 7.64% of the company's audited operating income for 2014. The total price of the alternative sales contract is also 169 million yuan. It is reported that the contract stipulates that one 1000T round pile crane will be delivered to Xiamen Shipbuilding Heavy Industry Terminal in batches from September 15, 2016; one 200T crane will be delivered to Xiamen Shipbuilding Heavy Industry Terminal in batches from October 15, 2016; The hydraulic plug-type lifting system will be delivered to Xiamen Shipbuilding Heavy Industry Terminal in batches from August 5, 2016. The company said that by fulfilling the above-mentioned contracts, it will further enhance the comprehensive strength of the company's marine wind power project overall solution in design, construction, installation and operation management services, which will help the company further expand the relevant market in the future. Stretch Film Roll,Nylon Plastic Film,Thermal Lamination Film,Thermal Lamination Bopp Film HUARUIDA PACKING MATERIAL CORP., LTD. , https://www.buybopp.com