On November 25th, Sinopec Baling Petrochemical Co., Ltd.'s new styrene project, one of the "Five-reform, Seven-for-one, and One-to-one" special chemical project, achieved intermediate transfer, marking that the annual output of 120,000 tons of styrene project will enter the drive preparation stage. At present, the styrene plant has completed the tasks of stand-alone trial operation, system pressure test and purge. After the project is put into production, it will enrich the connotation of the raw material base of Baling Petrochemical's olefins division, and help transform the company into a chemical-based refinery. The picture shows Baling Petrochemical's realization of an annual production capacity of 120,000 tons of styrene plant. Epoxy Coated Wire Mesh,Epoxy Wire Mesh,Epoxy Coated Welded Wire Mesh,Epoxy Coated Mesh HEBEI KANGLIDA METALNET CO.,LTD. , https://www.kldwovenwiremesh.com