Declaration and Approval of the "Export Mining Gold Mining Approval" Implementation Rules (1)

To implement the State Economic and Trade Commission, "on the issuance of" handling "mining gold mineral ratification" relevant provisions "notice" requirement, the State Economic and Trade Commission of gold Authority May 16 The relevant implementation rules for the declaration and examination and approval of the “Approval of Mining Gold Minerals” have been formulated as follows:

    1. Application materials and requirements submitted by the applicant to the examination and approval authority 1. Application documents for the applicant to mine gold minerals: The application documents shall be formally submitted by the mining gold mining applicant (or the preparatory unit), and the official seal of the applicant (or the preparatory unit) shall be affixed. The application documents include the following contents: ( 1 ) the reasons for applying for mining gold minerals; ( 2 ) the brief description of the application unit; ( 3 ) a brief description of the application for planning the geological resources of the mining area and the degree of work; ( 4 ) the construction plan, investment and funds Source; ( 5 ) A brief description of whether the professional engineering and technical personnel of the applicant unit, mining, and selection can achieve the ability to mine gold minerals of corresponding scale;
2. A copy of the “Exploration Permit” obtained by the prospecting right holder and the original; the non-prospecting right holder shall sign the agreement or contract in accordance with the “Administrative Measures on the Transfer of Exploration Rights and Mining Rights” (Decree No. 242 of the State Council).
3. A copy of the mineral resources reserve report reviewed by the relevant institution and a copy of the certificate issued by the relevant department and present the original. Mineral reserves assessment report resource identified by "on the promulgation <mineral resources assessment identified ways> of" (Guo Tu Zi Fa [1999] No. 205) file execution.
4. Project proposal or feasibility study report of the proposed mine.
5. Clearly indicate the regular map of the planned mining area. ( 1 ) Topographic geological maps greater than or equal to 1/2000 scale, the map should be marked with the planned mining area. The coordinates of the inflection point of the planned mining area are indicated by the national Cartesian coordinate system. ( 2 ) Administrative division map, the map should indicate the scope of the planned mining area, and other gold mines in the adjacent area should be marked.
6. Joint ventures, joint-stock enterprises or Sino-foreign joint ventures or cooperative enterprises shall be accompanied by the contract, the articles of association and the documents approved by the corresponding examination and approval authority.
7. Environmental impact assessment report approved by the environmental protection department.

    2. Instructions for filling out the “Application for Mining Gold Minerals”
1.
Cover: The “ Approval Certificate [ ] No. ” is filled in by the approval authority. The provincial-level (regional, municipal) gold management department fills in and is numbered uniformly. The format of the application form is: approval certificate + province (region, city) abbreviation + opening application + [ year ] + number (authorization certificate) The format is: approval form + province (region, city) abbreviation + gold + [ year ] + number); approved by the National Economic and Trade Commission Gold Administration, filled by the National Economic and Trade Commission Gold Authority, unified number, application form For: approval letter + opening application + [ year ] + number (authorization certificate format: approval certificate + national gold word + [ year ] + number). Approving authority: According to "apply the relevant provisions <mining gold mining ratification> of" fill in the appropriate approving authority name and official seal. Name of applicant: Fill in and stamp the official seal by the applicant.
2. The status of the applicant. Name: Name of the applicant for mining gold minerals. Address: The detailed address of the applicant's location. Legal representative: The name of the legal representative of the applicant. Economic type: the nature of the enterprise of the applicant, sub-national, joint venture, shareholding system, collective, foreign investment, etc. Main business: Fill in the corresponding contents of the business license of the mining gold minerals applicant. Sources of funds needed for construction: indicate the amount of funds for loans, self-raising and other financing methods. In the case of joint-stock mining, the amount and proportion of capital contributions of the shareholders of each party must also be indicated. Credit rating: fill in bank credit rating of the applicant.
3. Mine situation. Mine Name: Refers to the name of the proposed mine or the built mine. Name of the shareholders: Fill in the names of the major shareholders. Affiliation: The superior management department to which it belongs. Do not fill this column without affiliates. Service years: The mine is expected to be mined. Design mine size: Rock gold refers to the scale of ore processing, sand gold and heap leaching refers to the annual processing of ore (stone) scale. Construction investment: refers to the total investment amount of the proposed construction project.
4. Resource situation. Mine Name: Fill in the name of the mining area used in the Mineral Resources Reserve Report. Ore body name: Fill in the name of the ore body used in the mineral resource reserve report. Exploration level: fill in the exploration, detailed investigation and general survey achieved by the geological work of the mining area. Reserves: Fill in the retained reserves of Class D or above (including Class D ) approved in the Mineral Resources Reserve Report (adjusted accordingly after the change). A brief history and current situation of geological work and mining in this area: fill in the relevant content in brief in the brackets.
5. Plan the scope of the mining area: ( 1 ) How many inflection points are there, and indicate the coordinates of the inflection point; ( 2 ) the mining elevation; ( 3 ) the actual area of ​​the planned mining area (square kilometers).
6. Planned geological map of the mining area: The scale of the 1/2000 scale topographic geological map is scaled to 32 open specifications.

    3. Principles for delineating the scope of mining gold mining planned mining areas
The planned mining area is determined on the basis of the regional master plan based on the gold industry development plan, the national industrial policy, and the qualification conditions for applying for mining gold mineral enterprises; it is also the reference mine area that the land and resources management department is required to issue mining licenses to enterprises.

In the declaration and approval, the following principles must be observed:
1. In accordance with the requirements of national industrial policies, promote the scale operation of enterprises, protect the environment, improve the utilization rate of resources and economic benefits of enterprises, and eliminate redundant construction.
2. The scope of the planned mining area must be considered in terms of the qualifications and development capabilities of the enterprise, including capital, technology, and management level, so as to achieve a reasonable allocation of the construction scale and the planned mining area.
3. Delineation of the planned mining area should fully consider the unexplored mineralized bodies that have mineralization links with the proven ore bodies.
4. The planned mining area is exclusive, and the same planned mining area cannot be assigned to two or more enterprises.
5. Fully consider the established production pattern, and do a good job in delineating the planned mining area according to the characteristics of resource-based enterprises. Priority is given to supporting the formation of enterprise groups, giving priority to the state-owned key enterprises that have turned losses to help enterprises and resource crisis enterprises to expand their living space.

EPP Foam Sunshade

Epp Foam Sunshade,Epp Foam Automotive Sunshade,Epp Sun Visor,Epp Foam Sheet

Taizhou Tianma Plastic Products Co. LTD , https://www.tmepp.com